NSW ATAR aggregate estimate — 2025

Compare an already scaled aggregate with selected historical UAC thresholds.

Jump to result

NSW 2025 cohort only, from UAC's preliminary scaling report Table A9. This is a historical threshold band, not a prediction for another cohort.

Your inputs

Updates as you type

historical NSW 2025 ATAR band

85.00 to below 90.00

Scaled aggregate
350
Cohort / source
NSW 2025 preliminary UAC report, Table A9

No interpolation or raw-mark scaling is performed.

Calculations happen in your browser. Saving is optional.

Calculation breakdown

14 rows · View table
NSW ATAR aggregate estimate — 2025 — calculated breakdown
Selected ATARLowest scaled aggregate
50.00165.7
55.00190
60.00212.9
65.00237.2
70.00262
75.00287.5
80.00313.8
85.00341.6
90.00370.7
95.00404.6
98.00433.2
99.00447.8
99.50459.4
99.95479.4

How to use this tool

Enter an already scaled NSW aggregate out of 500.

Read the historical 2025 threshold band. Do not substitute raw HSC marks or use it as a prediction for another cohort.

Locate the aggregate between the published selected 2025 UAC ATAR thresholds

Worked example

85.00 to below 90.00 · historical NSW 2025 ATAR band

Fixed example using the settings below. Monetary examples use USD; dates and times use their stated reference values. This example stays unchanged when you edit your calculation.

Example inputs
  • Already scaled NSW aggregate (out of 500): 350

Method illustration: A scaled aggregate of 350 falls between the published 2025 thresholds for ATAR 85 and 90.

Assumptions and limits

  • NSW 2025 cohort only, from UAC's preliminary scaling report Table A9. This is a historical threshold band, not a prediction for another cohort.
  • Requires an already scaled aggregate. Raw HSC percentages cannot be added and substituted. The calculator does not reproduce course scaling or ATAR eligibility selection rules.
  • Only selected ATAR cutoffs are available, so the result is a band rather than an interpolated precise rank. It is not an official ATAR or an admissions guarantee.

Method reference: UAC 2025 preliminary scaling report, Table A9

Check or report a result

Check the units, selected calculation and assumptions first. Compare the fixed example above with your inputs to identify what changed.

Report a calculation issue with the page address, hypothetical inputs, result displayed and result expected. Do not include passwords, bank details or other private information.